Monday, September 10, 2018

11 Important Tips When Leasing Warehouse Space

11 Important Tips When Leasing Warehouse SpaceWarehouse and Industrial space can range from storage and manufacturing to distribution.  Each Industrial property you consider will have it’s own requirements and obligations so make sure you understand the use of the facility and ask the owner, landlord, and listing agent lots of questions to ensure the space meets your needs.

Below are a few things you should consider when leasing Warehouse or Industrial space:

Heating, Ventilation, and Air Conditioning (HVAC) – The majority of Industrial buildings are not delivered with full building HVAC.  If they choose to have it each tenant is responsible for the installation of their own HVAC unit.  In a lot of cases you end up leasing a space that was previously leased by someone else and they had installed and used an HVAC unit.  Because you don’t know if that tenant properly maintained the unit try to avoid assuming responsibility of a potentially neglected unit.

Negotiate with the landlord that you will pay for an HVAC maintenance contract to keep the existing HVAC unit property maintained, however if the unit needs a major repair or replacement the landlord should be responsible.  Before signing the lease always require that the landlord have the HVAC units inspected and repaired (if needed) and certified in writing that they are in good working condition by a certified HVAC technician.

Operating Expenses (aka NNN) – Make sure you understand what is and what is not included in the operating costs and what can be excluded (e.g. roof repairs).  Operating costs typically include taxes, insurance, and maintenance.  You need to know what the landlord is going to pay for and what you will be responsible for.

Square Footage – Some landlord calculate the square footage differently.  Make sure you know how they are doing their calculations and what they are including.  Ideally you only want to pay for your usable square footage which is the actual space you occupy.  Some landlords will try to include the area beneath the buildings drip lines and some will choose to calculate from the outside of the wall vs the middle or inside.

Parking Area – Parking lots require maintenance (asphalt or concrete) and some landlord’s try to make the tenants pay for that.  Repairs and maintenance should be the landlord’s responsibility because is a long term expense and part of future property value calculations.  What is the use of the parking?  Who will be using it the most?  Do you need to be able to park trucks or vehicles overnight?  If so make sure you have the ability to.

Zoning – Make sure the Industrial or warehouse property is zoned for your intended use.  Some retail tenants (e.g. martial arts) like the idea of leasing an industrial property because the lease rates are cheaper than retail.  However if the property is not zoned for retail use they will not be able to lease it……unless they or the landlord is willing to apply for a zoning change.  You also want to make sure the buildings parking ratio (spaces per 1000 sf) is sufficient for you.  If you need more then consider another building or look at retail space.

Maintenance of the property – Make sure you know what the landlord is responsible for and what you will be responsible for.  Trash will typically be at your expense.

Loading areas – Will you have products delivered or picked up via 18 wheeler or UPS type trucks?  If so then you will need dock high loading and a truck court big enough for 18 wheelers to maneuver.  Do you need the ability to drive trucks or other vehicles into the warehouse?  If so then you need grade level loading.  Whatever the case make sure you ask if the Industrial property has what you need or if the landlord is willing to install what you need.  Trailers and trucks used to be 45 ft +/- however these days they are 60 ft +/-.  What that means is you need at least a 120′ turning area.  Older Industrial properties may not be able to accommodate this.

Electric – Make sure the Industrial properties have electrical power sufficient for your needs.  Do you need 3 phase power?  If you or the landlord does not know what is available then hire an electrician or electrical engineer to evaluate the building.  You want to make sure the building has sufficient amperage and power so you don’t blow transformers or find out it’s underpowered later on.

Ceiling Height – Make sure you ask how high the ceilings are.  If you plan on stacking products or equipment or operating large equipment you want to make sure you know how high you can go.  Heights typically range from 18 ft to 25 ft

Expansion options – Ask the landlord if any adjacent tenants have renewal options.  If you plan on expanding later on it would be nice to know if you have the ability to do so.  If your neighbors have an expansion option on your space then negotiate to have the landlord move you at the landlords cost.

Floor Load – What is the floor load for the concrete slab vs what your intended use will be?

These are just a few things you should carefully evaluate before signing an Industrial or Warehouse lease.  If you have any questions about industrial space for rent in Austin or would like to discuss with us don’t hesitate to contact us!

 

Related Images:

[See image gallery at www.austintenantadvisors.com]

Questions To Ask Landlord Before Leasing Industrial & Warehouse Space

questions warehouse space landlordsLeasing industrial or warehouse space will be one of your biggest operating expenses so before you sign on the dotted line it’s important to ensure that the warehouse space will meet your business needs and that you know who is responsible for what. For example when negotiating Austin warehouse space for lease tenants are typically responsible for the repair and maintenance of the HVAC units.  Your needs are more than likely different than the next company, however below are a few questions (based on your needs) that you should get the answers to (in writing) before signing a lease.

  1. What total monthly lease rate are you quoting?  Please provide me with your quoted base and operating expenses (nnn).
  2. Is there any common area factor that I have to pay for or do I just pay for the actual usable square footage of the space?
  3. Who pays for electric and water?
  4. What all is included in the base rent as well as the operating expenses (nnn)?
  5. Does the space have an over head door or loading area?  If so is it grade level or dock high?
  6. Is there room for delivery trucks to pick up and deliver my products?  For example can an 18 wheeler back up to my space?
  7. I need to make sure I can receive and ship products.  Can you superimpose a WB-67 template on the properties site plan?
  8. How high are the ceilings in the warehouse?
  9. Does the warehouse have HVAC or is it hot?
  10. Who pays for the maintenance, repair, and/or replacement of the HVAC unit(s)?
  11. What are my signage opportunities?
  12. Am I required to install signage?
  13. What type of power is avaialable on the premises?
  14. What is the zoning of the property?
  15. Are you willing to pay for any tenant improvements?
  16. Who are the other tenants that lease warehouse space on your property?
  17. Am I allowed to park vehicles over night?
  18. What is the parking ratio of your property?
  19. What phone and internet providers service your property?
  20. How long of a lease term do you require?

Friday, September 7, 2018

How to Find Out Who Owns a Property or House

Finding out who owns a property is as easy as finding your property tax rate or the deed history. Most counties have an online property search data base that allows you to search for property information by address, owner name, etc. If you are in a rural county you may have to go to the local tax assessor’s office or public library to search paper records. Using Travis Central Appraisal District as an example below is how to find the property owner of a house or commercial real estate.

Steps to Finding the Property Owner

1. Go the Travis Central Appraisal District Website

property search travis CAD

2. Enter the Address in the Property Search Option Box

tcad property search options

3. Click on the View Details Link of Property You’re Searching For

traviscad property search results

4. Under the Property Tab You See the Owner name & mailing address

tcad property ownership records

Wednesday, September 5, 2018

A Guide to Answering Ten Commonly Asked Questions on Immigration

Only in America is there a deeply resonant story of being a nation of immigrants, but it is increasingly difficult given the misinformation that abounds in the media to see how the whole country wins when we harness the amazing achievements and strengths of immigrants.

The nation’s immigration debate centers on immigrants’ impact on our culture, security, and economy. We need not justify immigration policy solely by tugging at voters’ heartstrings with humanitarian narratives, and we need not assume that concerns about national security are driven by anti-immigrant narratives.

Lawmakers have a unique opportunity to use evidence and pragmatism to communicate that immigrants assimilate into American culture, help protect the United States from terrorists, and contribute to our economy.

This guide is intended to help answer common questions about immigration using economic and national security facts. Read it here.

The post A Guide to Answering Ten Commonly Asked Questions on Immigration appeared first on Niskanen Center.



from nicholemhearn digest https://niskanencenter.org/blog/a-guide-to-answering-ten-commonly-asked-questions-on-immigration/

Lighting a Path to Precision Medicine

Today the Niskanen Center released a new research paper — Lighting a Path to Precision Medicine: Regulatory and Policy Implications of Optogenetic Technology — looking at the emerging science and potential commercial applications of optogenetics. Using light-activated proteins (opsins) embedded in certain cells, optogenetics allows for targeted and controlled activations of these specific cells. As the paper notes, opsin gene expression “offers an unprecedented ability to control specific cell types with precise timing, opening the door to real-time therapeutic control of complex physiological functions.”

The paper describes specific examples of neurological and psychiatric diseases and conditions that could one day benefit from advancements in optogenetic therapies. These include epilepsy, drug addiction, Alzheimer’s, Parkinson’s, spinal cord injuries, and a variety of mood disorders, such as anxiety and depression. While certain safety and efficacy limitations abound, this is a rapidly developing field that could soon be ripe for commercial applications. Indeed, a number of optogenetic therapies for Retinitis pigmentosa, a form of blindness, have already been approved by the Food and Drug Administration (FDA) for clinical trials in humans, and at least one company is currently in the process of attempting to approve its optogenetic treatment for pain therapy.

Optogenetics promises an innovative new means of delivering precision medical treatment for those suffering from a variety of diseases and disorders, and flexible FDA guidance can play an invaluable role in supporting pathways to market approval.

From the executive summary:

Optogenetics is a bioengineering technology that allows for precisely timed control of brain cells using light. The technology involves adapting genes of light-responsive proteins found in microbial species such as algae to uses in animal and human tissues. Recently, the U.S. Food and Drug Administration has authorized clinical trials for the first-ever human use of optogenetic gene therapy, for treatment of a form of blindness. New biotechnology startups have sprung up with plans to bring optogenetics to the U.S. health care market. Wide-ranging clinical applications, from unique therapies for neurological and psychiatric disorders to new solutions for cardiac problems, make this technology an innovative player in the next generation of precision medicine.

This paper begins with a review of the latest scientific developments in optogenetics, followed by a discussion of the safety and effectiveness issues in clinical optogenetic applications and the complexities of the existing FDA regulatory pathways for approval of optogenetic therapy. The paper concludes by addressing larger social and policy questions surrounding the future use of optogenetics for human-enhancement purposes. Optogenetics is a potentially revolutionary medical technology and the current regulatory and policy landscape may determine its ultimate reach.

Read the full research paper here.

The post Lighting a Path to Precision Medicine appeared first on Niskanen Center.



from nicholemhearn digest https://niskanencenter.org/blog/lighting-a-path-to-precision-medicine/

Friday, August 31, 2018

Austin Tx Property Tax Rates | Travis County

The Austin Texas Property Tax Rates and Travis County Jurisdictions for 2013, 2014, 2015, 2016 and 2017 are listed here in this table in alphabetical order. Austin Tx property tax rates are typically set by each jurisdiction around September of each year. Property tax bills are presented in the November time frame. Check out this other post ff you are trying to find property tax rates for your Austin residence or commercial property 

This table will be updated as new rates are available which are typically posted on October 24th.

Tax Jurisdiction 2017 Tax Rate 2016 Tax Rate 2015 Tax Rate 2014 Tax Rate 2013 Tax Rate
Anderson Mill Limited District 0.11708300 0.12336000 0.12600000 0.13000000 0.13668600
Austin Community College 0.10080000 0.10200000 0.10050000 0.09420000 0.09490000
Austin ISD 1.19200000 1.19200000 1.20200000 1.22200000 1.24200000
Bastrop-Travis Counties ESD # 1 0.10000000 0.09470000 0.09330000 0.09960000 0.09440000
Belvedere MUD 0.37000000 0.38950000 0.42500000 0.45000000 0.45000000
City of Austin 0.44480000 0.44180000 0.45890000 0.48090000 0.50270000
City of Bee Cave 0.02000000 0.02000000 0.02000000 0.02000000 0.02000000
City of Cedar Park 0.45750000 0.47000000 0.47950000 0.48500000 0.49250000
City of Creedmoor 0.38000000 0.38000000 0.38000000 0.38730000 0.38730000
City of Elgin 0.65691600 0.65691900 0.65691600 0.75011000 0.75390000
City of Jonestown 0.56560000 0.56560000 0.56560000 0.56560000 0.57500000
City of Lago Vista 0.65000000 0.65000000 0.65000000 0.65000000 0.65000000
City of Lakeway 0.17410000 0.16120000 0.17000000 0.17000000 0.17480000
City of Leander 0.57786700 0.59900000 0.63292000 0.65292000 0.66792000
City of Manor 0.77220000 0.77380000 0.71180000 0.71180000 0.80950000
City of Mustang Ridge 0.49980000 0.47920000 0.49500000 0.49980000 0.41880000
City of Pflugerville 0.53990000 0.53990000 0.54050000 0.53360000 0.57360000
City of Rollingwood 0.20890000 0.20020000 0.20210000 0.20660000 0.22640000
City of Round Rock 0.43000000 0.42500000 0.41465000 0.41465000 0.41949600
City of West Lake Hills 0.06500000 0.05720000 0.05720000 0.05340000 0.05340000
Cottonwood Creek MUD # 1 0.85000000 0.91700000 0.91700000 0.95000000 1.09000000
Coupland ISD 1.04005000 1.04005000 1.04005000 1.04005000 1.04005000
Cypress Ranch WCID # 1 0.90000000 0.90000000 0.90000000 0.90000000 0.90000000
Del Valle ISD 1.46000000 1.52000000 1.53000000 1.47000000 1.47000000
Dripping Springs ISD 1.52000000 1.52000000 1.52000000 1.52000000 1.49000000
Eanes ISD 1.20000000 1.21250000 1.21250000 1.21250000 1.21250000
Elgin ISD 1.54000000 1.54000000 1.54000000 1.54000000 1.54000000
Hays Consolidated ISD 1.53770000 1.53770000 1.53770000 1.53770000 1.46130000
Hurst Creek MUD 0.32000000 0.34210000 0.36320000 0.37100000 0.39500000
Kelly Lane WCID # 1 0.95000000 0.95000000 0.95000000 0.95000000 0.95000000
Kelly Lane WCID # 2 0.95000000 0.95000000 0.95000000 0.95000000 0.95000000
Lago Vista ISD 1.32000000 1.32000000 1.32000000 1.32000000 1.32000000
Lake Travis ISD 1.40750000 1.40750000 1.40750000 1.40750000 1.40750000
Lakeside MUD # 3 0.84000000 0.84000000 0.84700000 0.87750000 0.90000000
Lakeside WCID # 1 0.75000000 0.75000000 0.80000000 0.80000000 0.85000000
Lakeside WCID # 2A 0.97000000 0.97000000 0.97000000 0.97000000 0.97000000
Lakeside WCID # 2B 0.97000000 0.97000000 0.97000000 0.97000000 0.97000000
Lakeside WCID # 2C 0.97000000 0.97000000 0.97000000 0.97000000 0.97000000
Lakeside WCID # 2D 0.97000000 0.97000000 0.97000000 0.97000000 0.97000000
Lakeway MUD 0.12580000 0.13600000 0.15360000 0.18360000 0.19630000
Lazy Nine MUD # 1A 1.00000000
Lazy Nine MUD # 1B 1.01000000 1.01000000 1.01000000 1.01000000 1.01000000
Leander ISD 1.51187000 1.51187000 1.51187000 1.51187000 1.51187000
Lost Creek Limited District 0.04890000 0.05250000
Manor ISD 1.51500000 1.51500000 1.51500000 1.51500000 1.51500000
Marble Falls ISD 1.27860000 1.28000000 1.28000000 1.28000000 1.28000000
Moore’s Crossing MUD 0.85580000 0.90700000 0.93240000 0.95800000 0.99000000
NE Travis County Utility District 0.68000000 0.78000000 0.86100000 0.87600000 0.89930000
North Austin MUD No. 1 0.28800000 0.28900000 0.31700000 0.33990000 0.34500000
Northtown MUD 0.70750000 0.70750000 0.72200000 0.73600000 0.75000000
Onion Creek Metro Park District 0.20000000 0.20000000
Pflugerville ISD 1.54000000 1.54000000 1.54000000 1.54000000 1.54000000
Pilot Knob #2 0.95000000
Pilot Knob #3 0.95000000 0.95000000 0.95000000 0.95000000
Presidential Glen MUD 0.29760000 0.30000000 0.50190000 0.50190000 0.50190000
Ranch at Cypress Creek MUD # 1 0.35250000 0.35650000 0.36500000 0.43300000 0.51280000
River Place MUD 0.07500000 0.20700000 0.23130000 0.31290000 0.33500000
Round Rock ISD 1.30480000 1.33250000 1.33250000 1.33750000 1.36740000
Senna Hills MUD 0.54110000 0.54110000 0.54110000 0.54110000 0.54900000
Shady Hollow MUD 0.04770000 0.03800000 0.04890000 0.04930000 0.05000000
Southeast Travis County MUD #1 0.98000000 0.98000000 0.98000000
Southeast Travis County MUD #2 0.98000000
Sunfield MUD # 1 0.90000000 0.90000000 0.90000000 0.90000000 0.90000000
Tanglewood Forest Limited Dist. 0.19000000 0.17540000 0.17880000 0.18300000 0.19300000
Travis Central Health 0.10738500 0.11054100 0.11778100 0.12640000 0.12900000
Travis County 0.36900000 0.38380000 0.41690000 0.45630000 0.49460000
Travis County Bee Cave Rd Dist # 1 0.21060000 0.25990000 0.32150000 0.57060000 0.62850000
Travis County ESD # 01 0.10000000 0.10000000 0.10000000 0.10000000 0.10000000
Travis County ESD # 02 0.10000000 0.10000000 0.09580000 0.09820000 0.10000000
Travis County ESD # 03 0.10000000 0.10000000 0.09000000 0.09080000 0.09640000
Travis County ESD # 04 0.10000000 0.10000000 0.09140000 0.10000000 0.09990000
Travis County ESD # 05 0.10000000 0.10000000 0.09180000 0.10000000 0.09780000
Travis County ESD # 06 0.10000000 0.10000000 0.10000000 0.10000000 0.10000000
Travis County ESD # 07 0.09790000
Travis County ESD # 08 0.09980000 0.09980000 0.09980000 0.09980000 0.09980000
Travis County ESD # 09 0.07550000 0.07299000 0.07416000 0.07510000 0.08080000
Travis County ESD # 10 0.10000000 0.10000000 0.10000000 0.10000000 0.10000000
Travis County ESD # 11 0.10000000 0.10000000 0.10000000 0.09810000 0.10000000
Travis County ESD # 12 0.10000000 0.10000000 0.10000000 0.10000000 0.10000000
Travis County ESD # 13 0.10000000 0.10000000 0.10000000 0.10000000 0.10000000
Travis County ESD # 14 0.10000000 0.10000000 0.10000000 0.10000000 0.10000000
Travis County ESD # 15 0.10000000
Travis County MUD # 02 0.91730000 0.93000000 0.95850000 0.97450000 0.98000000
Travis County MUD # 03 0.48150000 0.48150000 0.48250000 0.48410000 0.50000000
Travis County MUD # 04 0.72960000 0.72960000 0.72960000 0.72960000 0.72960000
Travis County MUD # 05 0.60300000 0.69750000 0.74280000 0.76930000 0.81200000
Travis County MUD # 06 0.48480000 0.46000000 0.46000000 0.46000000 0.47100000
Travis County MUD # 07 0.90890000 0.90890000 0.90890000 0.90890000 0.90890000
Travis County MUD # 08 0.71450000 0.71450000 0.71450000 0.72130000 0.72130000
Travis County MUD # 09 0.82750000 0.84350000 0.85950000 0.87560000 0.87560000
Travis County MUD # 11 0.61020000 0.69250000 0.73750000 0.77250000 0.77250000
Travis County MUD # 12 0.77250000 0.77250000 0.77250000 0.77250000 0.77250000
Travis County MUD # 13 0.77250000 0.77250000 0.77250000 0.77250000 0.77250000
Travis County MUD # 14 0.87810000 0.90500000 0.90500000 0.94000000 0.99000000
Travis County MUD # 15 0.40750000 0.33250000 0.33250000 0.33250000 0.33250000
Travis County MUD # 16 0.95000000 0.95000000 0.95000000 0.95000000 0.95000000
Travis County MUD # 17 0.95000000 0.95000000 0.95000000 0.95000000 0.95000000
Travis County MUD # 18 0.75000000 0.75000000 0.75000000 0.75000000 0.75000000
Travis County MUD # 21 0.31250000 0.31250000 0.31250000 0.31250000 0.31250000
Travis County MUD # 23 0.41010000
Travis County MUD # 24 0.95000000
Village of Briarcliff 0.14740000 0.16050000 0.16050000 0.16050000 0.11750000
Village of Point Venture 0.12160000 0.11310000 0.10950000 0.10950000 0.10500000
Village of San Leanna 0.24980000 0.24980000 0.24980000 0.24980000 0.24980000
Village of The Hills 0.06000000 0.06000000 0.06000000 0.02485000 0.02480000
Village of Volente 0.10850000 0.10650000 0.10000000 0.13000000 0.13000000
Village of Webberville 0.37420000 0.34020000 0.30510000 0.27740000 0.27740000
WCID # 10 0.09460000 0.06670000 0.02940000 0.02950000 0.02970000
WCID # 17 0.05990000 0.05990000 0.05850000 0.05750000 0.05750000
WCID # 17 (Flintrock Ranch Estates) 0.39960000 0.43200000 0.45050000 0.45260000 0.46560000
WCID # 17 (Serene Hills) 0.62500000 0.62500000 0.65000000 0.65000000 0.65000000
WCID # 17 (Steiner Ranch) 0.29870000 0.30000000 0.37510000 0.42850000 0.44980000
WCID # 18 0.08550000 0.09390000 0.09520000 0.09500000 0.21130000
WCID # 19 0.23070000 0.22500000 0.24000000 0.26000000 0.26000000
WCID # 20 0.20000000 0.20550000 0.20720000 0.23000000 0.24000000
WCID Point Venture 0.62470000 0.62530000 0.62530000 0.39910000 0.39910000
Wells Branch MUD 0.37950000 0.38730000 0.39000000 0.43000000 0.46000000
West Travis County MUD # 3 0.25500000 0.28200000 0.28200000 0.27200000 0.27200000
West Travis County MUD # 5 0.25650000 0.26000000 0.26000000 0.26000000 0.26000000
West Travis County MUD # 6 0.45000000 0.45000000 0.45000000 0.45000000 0.45000000
West Travis County MUD # 8 0.52100000 0.55100000 0.61100000 0.73000000 0.84000000
Wilbarger Creek MUD # 1 0.87800000 0.88950000 0.90800000 0.92500000 0.94840000
Wilbarger Creek MUD # 2 0.95000000 0.95000000 0.95000000 0.95000000 0.95000000
Wmsn Co WSID # 3 0.72300000 0.72300000 0.73060000 0.80820000 0.81500000
Wmson & Travis Counties MUD # 1 0.43160000 0.46620000 0.51000000 0.54000000 0.61500000

For more info check out Travis County Tax

What is Amortized Tenant Improvement Allowance For Commercial Space Build-Outs?

amortizing tenant improvement allowanceWhen negotiating a commercial lease you typically ask to receive a tenant improvement allowance to cover tenant build out costs such as new flooring, new walls and paint, demo, etc. Before signing the commercial lease contract it’s always a good idea to get at least 2-3 preliminary construction bids to make sure the total cost does not exceed your negotiated TI allowance.

However tenant finish-out projects don’t always meet their budget for a variety of reasons. For example if the tenant makes changes to the scope of work or the contractor discovered a large ticket item that was not known during the preliminary construction bid. Either way there will be times when the total tenant build-out costs exceed the negotiated tenant improvement allowance.

So what do you?

Well you have a few of options which need to be negotiated before the commercial lease is signed and executed.

  1. The first option is for your company to come out of pocket and pay for the build-out costs that exceed the tenant improvement allowance up front.
  2. The 2nd option is for you to get a loan like an SBA loan.
  3. The other option is to negotiate an additional allowance (aka amortized TI) that covers the overage amount an amortize it into the lease. We will discuss in more detail below.

What Does Amortization Mean?

In business amortization means to spread payments over multiple periods. For example the amortization of a loan that includes principal and interest that is determined by an amortization schedule.

Amortized Tenant Improvements (TI) Allowance

This is essentially a loan from the landlord for the additional allowance that the tenant has to pay back over the life of their term. The landlord will typically give this money upfront to pay for the improvements. When it comes to amortizing tenant improvements it basically means you don’t have to pay back the money all at once. The money is being added to the total rent due at an interest rate the landlord charges and divided by the number of months in the lease term.

When Do You Negotiate the Amortized Tenant Allowance?

The additional allowance is typically negotiated during the initial lease term negotiations on the term sheet or proposal. This is done fairly often as it’s nice to have the ability to tap into it rather than having to go to the bank for a loan.

Interest Rate for Amortized TI

The interest rate will vary from landlord to landlord and dependent on the market however in most cases it will range from 7% to 9% per annum

How To Calculate Amortized Tenant Improvements

Suppose your leasing 3,000 sf of office space for 5 years and the landlord has agreed to give another $30 sf above and beyond the initial tenant allowance at 7.5%

  1. Using a Google sheet or financial calculator enter the amount of the loan 
  2. Enter the annual interest rate
  3. Enter the term of the loan
  4. Enter payments per year

So

  1. Amount of loan = $90,000 ($30 x 3,000 sf)
  2. Annual Interest Rate = 7.5%
  3. Term of loan = 60 months (5 year lease)
  4. Payments per year = Same as when rent payments are due so = 12

When you enter the above information to a Google Sheet you get the Tenant Improvement Amortization Schedule.

As you can see $1,803.42 is the additional monthly payment that will be added to your total monthly rent.

Benefits of Amortizing Additional Tenant Improvement Allowance

The main benefit is it gives the tenant some backup funding in the event the build-out costs exceed the tenant improvement allowance. You may not have the cash on hand to cover it so having this pre-negotiated will eliminate any worry. Many startups or new businesses are typically in this situation. If costs go over you can avoid having project delays and be able to finish out the space the way you want, rather than having to scale back on the scope of work.

Example of Amortized TI Allowance

If the cost of the Landlord’s Work exceeds the Construction Allowance, then Tenant may, prior to the conclusion of the Landlord’s Work, request that Landlord increase the Construction Allowance by the amount of the excess, up to a maximum of $51,420.00 (the actual amount of the increase being the “Additional Allowance”). If Tenant timely requests the increase in the Construction Allowance, then Landlord shall increase the Construction Allowance by the amount of the Additional Allowance. Landlord shall prepare, and Landlord and Tenant shall promptly execute and deliver, an amendment to this Lease increasing the Base Rent by the amount needed to amortize the Additional Allowance over the Lease Term at 8% per annum, with the increased payments commencing with the first Base Rent payment due under this Lease.